Statistical Process Control

Complete online SPC toolkit for manufacturing quality control. Real-time process monitoring, control charts, and automated alerts. Minitab alternative—free during Beta.

• Statistical Process Control distinguishes common cause vs special cause variation

• SPC enables proactive defect prevention rather than reactive quality inspection

• SPC is foundational to Six Sigma Measure and Control phases

Launch SPC Suite →

Complete Control Chart Library

Variable Charts

X-bar, R, I-MR, X-bar S, CUSUM, EWMA for continuous data

P

Attribute Charts

p-chart, np-chart, c-chart, u-chart for defect data

Cpk

Capability

Cpk, Ppk, histograms, normality tests

MSA

Measurement

Gauge R&R, bias studies, linearity

Methodology Overview

Variable Charts monitor continuous measurement variation (dimensions, weights, temperatures) using statistical measures of central tendency and dispersion.

Attribute Charts monitor defect occurrence patterns when measurements are counts rather than continuous values (pass/fail, defect counts).

Capability Tools evaluate specification compliance only after stability is confirmed via control charts. Process capability requires stability first.

Measurement Tools validate data reliability before SPC deployment. MSA/Gauge R&R ensures measurement error doesn't mask true process variation.

Western Electric Rules (Auto-Detection)

Statistical Foundation: SPC assumes stable processes produce random variation patterns. Western Electric rules identify statistically unlikely variation patterns with low probability of occurring randomly that signal potential special cause variation requiring investigation. Different industries may apply customized rule combinations based on risk tolerance and false alarm costs.
1
Point beyond 3σ

Any single point outside control limits indicates immediate process change.

2
9 points same side

Nine consecutive points on same side of center line suggests process shift.

3
6 points trending

Six consecutive points steadily increasing or decreasing indicates drift.

4
2 of 3 beyond 2σ

Two out of three consecutive points beyond 2σ on same side warns of instability.

5
4 of 5 beyond 1σ

Four out of five consecutive points beyond 1σ on same side suggests increased variation.

6
15 points within 1σ

Fifteen consecutive points within 1σ of center indicates stratification (subgroups present).

7
8 points beyond 1σ

Eight consecutive points beyond 1σ of center suggests mixture of two distributions.

8
14 points alternating

Fourteen consecutive points alternating up and down indicates over-adjustment.

SPC Assumptions

Valid SPC application requires specific statistical and operational conditions:

Process Stability Requirement

Process must be stable before capability analysis. Control charts establish stability; capability analysis follows. Calculating Cpk on unstable processes produces misleading results.

Validated Measurement System

Measurements must come from validated measurement systems. MSA must confirm gauge R&R < 30% (preferably < 10%) before SPC deployment. Measurement error can mask true process signals.

Representative Sampling

Sampling must represent true production conditions. Sampling only first-shift production or excluding setup periods creates biased charts that don't reflect actual process behavior.

Data Independence

Data points assumed independent unless autocorrelation evaluated. Sequential measurements that influence each other (e.g., temperature in heat-treated batches) require special chart types or time-series adjustments.

Control vs Specification Limits

Control limits represent natural process variation (3σ from mean), not specification limits. Capable processes may show control limit violations; in-control processes may produce out-of-specification output.

Model Limitations

Variation Detection Only

SPC identifies variation but does not diagnose root causes. Control chart signals indicate when to investigate, not why variation occurred. Root cause analysis tools are required for problem-solving.

Data Collection Dependency

SPC effectiveness depends on consistent data collection. Irregular sampling, missed measurements, or inconsistent operator techniques produce misleading charts and false signals.

Distribution Stability

SPC assumes statistical distribution stability. Processes with frequent distribution changes (batch-to-batch variation, seasonal effects) may require adaptive control limits or short-run SPC methods.

Non-Normal Data Constraints

Standard SPC charts assume approximately normal data. Highly skewed processes (time-to-failure, particle counts) may require transformation (Box-Cox) or non-parametric control charts for valid interpretation.

When NOT to Use SPC

SPC is inappropriate for certain quality management scenarios:

Prototype or Unstable Processes

Prototype or unstable early production processes lack the consistency required for meaningful control limits. Establish basic process stability before implementing SPC.

One-Time Project Quality Evaluation

One-time project or batch-only quality evaluation doesn't provide the time-series data SPC requires. Use inspection or capability studies instead for single-batch validation.

Extremely Low-Volume Production

Extremely low-volume production environments (job shops with runs of n < 10) lack sufficient data for reliable control limit calculation. Use pre-control or 100% inspection instead.

Causal Modeling Requirements

Situations requiring causal modeling or optimization need Design of Experiments (DOE) or regression analysis, not control charts. SPC monitors; DOE optimizes.

Industries Served

🏭

Manufacturing

Automotive, aerospace, electronics

Manufacturing uses SPC for yield improvement and defect reduction
💊

Pharmaceutical

FDA compliance, batch records

Pharmaceutical industries use SPC for regulatory compliance and batch validation
🍔

Food & Beverage

HACCP, quality consistency

Food production uses SPC for HACCP monitoring and consistency control
🏥

Healthcare

Patient safety, lab quality

Healthcare uses SPC for patient safety monitoring and lab quality control

Energy

Process efficiency, reliability

Energy industries use SPC for reliability and process efficiency monitoring
📱

Technology

Semiconductor, assembly

Technology manufacturing tracks yield and defect patterns with SPC

Industry Applications

Semiconductor Fabrication

Semiconductor fabrication uses SPC for yield monitoring across wafer processing steps. Critical dimensions (CD), overlay, and thickness parameters require real-time SPC to maintain nanometer tolerances.

Aerospace Tolerance Control

Aerospace manufacturers use SPC for tolerance control validation on critical safety components. Cpk requirements of 1.67 or higher are standard for flight-critical parts.

Food Manufacturing HACCP

Food production integrates SPC with HACCP plans, monitoring critical control points (CCPs) like temperature, pH, and metal detection to prevent contamination.

Oil & Gas Process Safety

Oil and gas operations use SPC for process safety monitoring, tracking pressure, temperature, and flow rates to prevent hazardous deviations before they trigger alarms.

Telecom Network Reliability

Telecommunications providers monitor network reliability using control charts for latency, packet loss, and uptime, ensuring service level agreement (SLA) compliance.

Medical Device Manufacturing

Medical device manufacturers use SPC for FDA-compliant process validation, tracking critical quality attributes during production with full audit trail documentation.

Decision Context

Web-based SPC improves collaboration and data accessibility across distributed teams. Shop floor operators, quality engineers, and management access the same real-time data without file version conflicts.

Real-time monitoring improves reaction speed to variation. Traditional batch analysis (end-of-shift reporting) allows hours of off-target production; real-time alerts enable immediate correction.

SaaS SPC reduces infrastructure deployment cost. No server installation, IT maintenance, or software updates required. Automatic feature updates without disruption.

Desktop tools remain useful for offline statistical experimentation and complex analysis not requiring real-time monitoring. Many organizations use both: desktop for deep analysis, web-based for operational monitoring.

Beginner's Guide to SPC

What SPC Monitors

SPC monitors process variation over time. Every process has natural variation (common cause), but sometimes special factors (tool wear, material changes) create unusual patterns. SPC distinguishes between these to prevent overreaction to normal variation and underreaction to real problems.

Why Variation Control Improves Quality

Consistent processes produce predictable output. When variation is controlled, you can tighten specifications, reduce inspection, and trust your process to meet customer requirements without 100% checking.

Real-World Example: Coffee Shop Brewing

Without SPC: Baristas guess when espresso extraction is "about right." Some shots are bitter (over-extracted), some sour (under-extracted). Customers complain, baristas adjust randomly, quality varies by shift.

With SPC: Track extraction time (25-30 seconds target) on a control chart. When times drift toward limits, investigate (grind setting, tamp pressure, bean freshness). Consistent shots, happy customers, less waste.

Frequently Asked Questions

What is the difference between SPC and quality inspection?

Inspection sorts good from bad after production (reactive). SPC monitors process variation to prevent defects (proactive). SPC asks "Is the process stable?" while inspection asks "Is this part good?" SPC prevents defects; inspection detects them.

What control chart should be used for different data types?

Continuous data (measurements): I-MR (individuals), X-bar R (subgroups), X-bar S (large subgroups). Attribute data (counts): p-chart (fraction defective), np-chart (number defective), c-chart (defect counts), u-chart (defects per unit).

Why can processes be stable but not capable?

Stability means consistent (predictable) output. Capability means output meets specifications. A process can be stable (always making 11mm parts) but incapable (specification is 10±0.5mm). Control charts show stability; capability indices (Cpk) show capability.

When should capability analysis follow SPC?

Always establish stability first. Capability analysis requires stable processes. Cpk calculated on unstable data is meaningless because the process isn't predictable. Use control charts first, then capability.

How often should SPC charts be updated?

Update frequency depends on production volume and criticality. High-volume production: real-time or hourly. Low-volume: per shift or daily. Update control limits (recalculate) only when process fundamentally changes, not routinely.

What sample size is needed for control limits?

Minimum 20-25 subgroups (typically 100+ individual data points) for reliable control limit calculation. Fewer points create wide, unstable limits that change significantly with each new point.

Deploy SPC in Minutes, Not Months

No IT, no installation, no credit card. Professional quality control—free.

Start Using SPC Software →